Permits & Inspections Guide

Electrical Panel Permits and Inspections in Dallas, Mesquite, Garland and Rowlett

Reviewed by a state-licensed master electrician (TECL #40613 [verify on TDLR]) · Kravolt Electric
Replacing a main electrical panel is permitted, inspected work in every city we serve. That’s not paperwork for its own sake. A panel replacement means the utility shuts off your power, the main service wiring gets opened up, and a city inspector checks the new equipment before power comes back.
This guide explains who does what, in what order, and what the inspector looks at. It should help you know what to expect and what to ask any electrician you’re considering.
One caution first. Permit rules, fees, and code editions differ by city and change over time. Treat this as a map, then confirm the details with your city’s building inspection office.

The short version

Who pulls the permit

Usually, your electrical contractor. A licensed contractor files the permit with the city, schedules the inspection, and is responsible for the work passing.
Homeowners are a more complicated case. Texas law exempts homeowners from electrician licensing when they work on a home they own and live in. But the exemption doesn’t excuse the work from the National Electrical Code (NEC), and cities can regulate electrical work themselves. A federal appeals court has even upheld a Texas city’s permit rules over a homeowner who relied on the state exemption.

Cities handle this differently. Dallas, for example, has published a homeowner permit process that requires proof of homestead and plans filed with the city. Some Texas cities exclude main service work from homeowner permits altogether. 

Our advice is to leave a panel replacement to a licensed electrician even where the city allows otherwise. The wires coming into the main breaker stay live until the utility disconnects service, and no breaker in your house turns them off. That’s the part of the job that hurts people.

What happens, step by step

1. Site check and quote

The electrician looks at the panel, the meter socket, the service mast, and the grounding, and decides what needs replacing. A good quote lists the permit, the utility coordination, and any meter or mast work up front.

2. Permit

The contractor files the electrical permit with the city. Turnaround varies by city and how the permit is filed, so ask your electrician for a realistic date instead of planning around a number you read online.

3. Utility disconnect request

The utility has to cut power at the service before the old panel comes out. The request is usually placed by the electrician or through your retail electricity provider, and the utility sets the schedule. We can ask for a window, but the utility decides.

4. Work day

The old panel comes out and the new one goes in, along with the main disconnect, breakers, grounding, surge protection, and labeling. If the meter socket, mast, or weatherhead is damaged or too small for the new service, that gets replaced too.

5. Inspection

The city inspector reviews the work. Some cities inspect the same day, and others schedule a window. [Confirm each city’s process.] If something fails, it gets corrected and re-inspected.

6. Clearance and reconnect

After the work passes, the city confirms to the utility, and the utility reconnects power. Many jobs are finished in a day, but nobody controls the inspector’s or the utility’s calendar. If a contractor promises a specific restoration hour, treat that as a guess.

Oncor and Garland Power & Light: what changes

Most homes in Dallas, Mesquite, and Rowlett get their delivery service from Oncor. Most Garland homes are served by Garland Power & Light (GPL), a city-run utility, and some Garland addresses are served by Oncor. Zip codes in Garland can be split between the two, so your electric bill is the quickest way to tell.

The process looks similar either way: a disconnect, the work, an inspection, a reconnect. The difference is in the details, like which office takes the request, what the utility requires for the meter socket and mast, and how the city’s inspection result gets to the utility. Ask your electrician which utility serves your address and how they handle that utility’s process. If the answer is vague, that’s worth noticing. 

What the inspector checks

Checklists vary by city and by which NEC edition the city enforces. These are the items that matter most on a residential panel replacement.

Working space

The panel needs clear space in front of it: at least 30 inches wide, 36 inches deep, and 6.5 feet of headroom under NEC 110.26. That means no water heater, shelving, or storage in front of the panel.

Panel location

Panels can’t go in bathrooms or clothes closets.

Grounding electrode system

This is how the electrical system connects to earth. It’s usually made of ground rods (commonly two, driven at least 6 feet apart, unless a single rod tests at 25 ohms or less) and a bond to metal water piping where it exists. The conductors have to be the right size and the clamps accessible.

Neutral and ground connections

Neutral and ground are bonded together at the main disconnect and nowhere else. They stay separate in any subpanel. Getting this wrong is one of the most common mistakes in the field.

Breakers and wire sizes

Each breaker has to match the wire it protects, and only breakers listed for that panel can be used in it. Double-tapped breakers (two wires on one terminal) are a common reason for a failed inspection unless the breaker is rated for it.

AFCI and GFCI protection

Current NEC editions require arc-fault protection in most living areas of a home and ground-fault protection in bathrooms, kitchens, garages, outdoors, laundry areas, unfinished basements, and near sinks. Exactly which rooms apply depends on the edition your city has adopted.

Surge protection

NEC 230.67 requires a Type 1 or Type 2 surge protective device on services that supply dwelling units, installed as part of the service equipment or immediately adjacent to it. It applies when service equipment is replaced, so it’s part of a panel replacement. We cover this in our whole-home surge protection guide.

Labeling

Every circuit needs a legible directory. “Misc” and “?” don’t count.

Service entrance equipment

The meter socket, mast, and weatherhead need to be secure, weatherproof, and installed to the utility’s requirements, including clearances and the drip loop. Our meter socket page covers the common failures.

Common reasons an inspection fails

Most of these are quick to correct. Each one costs a re-inspection and a delay, and some cities charge for repeat visits. 

Not every unpermitted job ends badly. But each of these is a real possibility:
If you already have an unpermitted panel, call your city’s building inspection office and ask how it handles after-the-fact permits. [Confirm each city’s process and fees.] A licensed electrician can help you work through it.

What it costs

Each city sets its own permit fees, and they’re typically tied to the scope or value of the job. Check your city’s current fee schedule instead of relying on a number from an article. Our quotes include permit fees, so there’s nothing to add later.

For the full price picture, see our 200-amp panel upgrade cost guide.

Questions to ask before you hire an electrician

  1. Can I see your license on the TDLR license search, and is the permit pulled in your company’s name?
  2. Who requests the utility disconnect and reconnect, and what happens if the utility’s schedule slips?
  3. Is a surge protective device included in the quote?
  4. Does the quote include the meter socket and mast if they need work, or is that an add-on?
  5. What happens if the inspection fails, and who pays for the re-inspection?
  6. Will I get a copy of the permit and the passed inspection?
A contractor who answers these easily has done this before.

Frequently asked questions

It depends on your city. Texas exempts owner-occupants from electrician licensing, but cities can require permits, limit what homeowners can do, or exclude main service work. Dallas has a published homeowner permit process. Check with your city before assuming. We recommend a licensed electrician for any work involving the main service.

It varies by city and by how the application is filed. Ask the city or your electrician for a current estimate.

Often, but not guaranteed. It depends on when the utility disconnects, how long the work takes, and when the inspector is available.

No. An inspection checks the main code items on the day of the visit. It’s a safety check, not a warranty. That’s why who does the work matters as much as the permit.

Want a licensed electrician to handle the permit and inspection?

Schedule a free panel inspection and we’ll give you a written quote that includes permits and utility coordination.