Will Your Panel Handle an EV Charger? Load Calculations for Dallas, Mesquite, Garland and Rowlett
The short version
- EV chargers count as a continuous load, so the breaker is sized at 125% of the charger's amps. A 48-amp charger needs a 60-amp breaker.
- Whether your panel can handle it comes from a load calculation of your whole house, not from the charger alone.
- Texas moved to the 2026 NEC on September 1, 2026, which changed how the calculation works. [Confirm your city's enforcement date and any local amendments.]
- If the numbers don't fit, you have three options: a 200-amp upgrade, load management, or a lower-amperage charger.
- A new 240-volt circuit needs a permit and an inspection.
The charger side: breaker and wire size
| Charger output | Load at 240V | Breaker | Typical copper wire |
|---|---|---|---|
| 16 A | 3,840 VA | 20 A | #12 |
| 24 A | 5,760 VA | 30 A | #10 |
| 32 A | 7,680 VA | 40 A | #8 |
| 40 A | 9,600 VA | 50 A | #6 |
| 48 A | 11,520 VA | 60 A | #6 |
The panel side: the load calculation
- Standard method. Adds each load with its own demand factor.
- Optional method. A shorter version for single-family homes: general loads are counted at 100% up to a threshold and 40% beyond it, and the largest of heating or cooling is added on top.
- Existing-home methods. For houses that are already built, the NEC also allows a calculation based on your real peak demand, or a simplified add-on table. These often show more spare capacity than the paper calculation does. [Confirm section numbers under the 2026 NEC.]
What changed in the 2026 NEC
- Load calculation rules moved from Article 220 to Article 120.
- General lighting is counted at 2 VA per square foot, down from 3.
- In the optional method, the first tier counted at 100% is 8,000 VA, down from 10,000.
- EV chargers are counted at their nameplate rating, at 100%. The old 7,200 VA minimum no longer applies when the nameplate is known.
A worked example
| Load | VA |
|---|---|
| General lighting: 2,100 sq ft × 2 VA | 4,200 |
| Kitchen small-appliance circuits (2) and laundry circuit | 4,500 |
| Electric range | 12,000 |
| Electric dryer | 5,000 |
| Electric water heater | 4,500 |
| Dishwasher | 1,200 |
| General loads total | 31,400 |
| First 8,000 VA at 100% | 8,000 |
| Remaining 23,400 VA at 40% | 9,360 |
| Subtotal after demand factors | 17,360 |
| 4-ton air conditioner (nameplate, gas heat assumed) | 6,000 |
| Total without a charger | 23,360 VA (about 97 A) |
| Plus a 48 A charger (11,520 VA) | 34,880 VA (about 145 A) |
| Plus a 32 A charger (7,680 VA) | 31,040 VA (about 129 A) |
| Panel size | Capacity | 48 A charger | 32 A charger |
|---|---|---|---|
| 100 A | 24,000 VA | Does not fit | Does not fit |
| 150 A | 36,000 VA | Fits, barely | Fits |
| 200 A | 48,000 VA | Fits | Fits |
If your panel is maxed out
1. Upgrade to 200-amp service
Best when the panel is old, the brand is a known problem (Federal Pacific, Zinsco), or you’re planning a second EV, a pool, or electric cooking. The job usually includes a new meter socket and a surge protective device, and the utility handles the disconnect. See our panel upgrade service areas.
2. Add load management
3. Install a lower-amperage charger
Permits and utilities
Installing a new 240-volt circuit for a charger needs an electrical permit and a city inspection in the cities we serve. [Confirm each city’s requirements.] Texas licensing rules require a licensed electrician for most residential work, with a homeowner exemption that cities can limit. We explain how that works in our permit and inspection guide.
The utility only gets involved if the project includes a service upgrade. Then Oncor or Garland Power & Light disconnects and reconnects power, and the city inspection comes first. Our meter socket page covers what changes at the meter.
For code references, see NFPA 70, the National Electrical Code, and the Texas Department of Licensing and Regulation’s electrician page to check any electrician’s license.
Hardwired or plug-in?
Frequently asked questions
Rarely. In most homes with electric cooking, a dryer, and central air, the calculation exceeds 100 amps before the charger is even added. A lower-amperage charger or load management can sometimes work in a lighter-use home. The calculation decides.
Usually, yes. Many cities want one with the permit, and it’s the only way to know the panel is safe for the added load. Ask your city what documents it requires. [Confirm each city.]
Only with care. A dryer circuit is typically 30 amps, so continuous charging should stay at 24 amps or less. Use a listed splitter or charging adapter, not a homemade one, and replace a worn receptacle. A dedicated circuit is a better long-term answer.
A circuit and hardwired charger is often a few hours. A panel or meter upgrade takes longer, and the utility and city inspection set the timing. We’ll give you a realistic window in the quote. [Confirm your typical timing.]
No. Many homes run a Level 2 charger on 100 or 150 amps. It depends on the calculation, the charger’s amperage, and what else the house runs.
A modern panel with room to add circuits is a selling point for many buyers, but it doesn’t guarantee a higher price. Think of it as removing an obstacle, not adding value on paper.
Pingback: 2026 Breaker Box Replacement Cost: 100A vs. 200A Upgrade